Working engineered door core assembly station

Factory-integrated execution

Control the order.
Not just the final photo.

LANDO connects the commercial brief to an approved manufacturing route, then manages samples, checkpoints, packing and export release around the agreed specification.

Image and capability policy

The photographs below are representative manufacturing-process references, not evidence that every machine or facility is owned by LANDO. The nominated factory, process route, capacity and order-specific inspection scope are confirmed before contract.

Production sequence

The questions behind the finish.

Process requirements change by PVC foil, melamine, WPC and steel programs. LANDO records the agreed variables in the order file.

Protected doors and frames staged for export shipmentExport process reference

Export packing

Protection planned for the route.

Finish sensitivity, loose frames, glass, hardware, container mix and unloading method change the packaging solution. The final pack is confirmed against the actual product mix.

01Surface, edge and corner protection
02Frame, casing and hardware separation
03Shipping marks and model identification
04Container loading sequence and record

Quality gates

Inspection is a plan, not a promise.

The scope is agreed by product risk, order value and buyer requirement. Independent third-party inspection can be discussed where appropriate.

01Pre-production file

Approved sample, drawing, BOM, finish code, hardware schedule, labels and packing baseline.

02Incoming and first article

Key materials and the first completed unit checked before batch production continues.

03In-process review

Selected dimensions, machining, edge, finish consistency and assembly sampled during production.

04Pre-shipment release

Quantity, model mix, appearance, packing, shipping marks and loading condition reviewed.

Have a supplier or need one?

LANDO can coordinate the product file around the order.

Share your schedule, acceptance priorities and shipment window.