Durable project surfaces
For clinic, school, office, hotel and higher-use interiors, subject to selected laminate and complete doorset specification.

Brief-led sourcing
When the requirement extends beyond the core range, LANDO identifies a suitable manufacturing route and controls it through drawings, BOM, sample approval, inspection and commercial documentation.
Controlled extension
LANDO’s project-sourced range may cover HPL/CPL-faced doors, moulded-skin doors, steel entrance doors, hotel entry doors and other schedule-led products. The actual producer, technical capability and evidence route are approved before contract.
This route is best used when the buyer has enough quantity and a clear specification to justify supplier qualification and sample work.

Visual shortlist
These models help identify product type and design intent. Each project then moves to supplier matching, samples and documented approval.
Available routes
The broader the product range, the more important supplier qualification and approval discipline become.

For clinic, school, office, hotel and higher-use interiors, subject to selected laminate and complete doorset specification.

For repeatable residential and renovation channels where skin, core, coating and frame need a controlled baseline.

For distribution or projects where lock system, reinforcement, opening and finish must match local expectations.
Approval path
LANDO only treats a sourced product as quotation-ready after the relevant commercial and technical gaps are visible.
Translate images, door schedule, destination needs, quantity and price target into a comparable request.
Check process fit, capacity, sample route, repeatability, export packing and available evidence.
Approve physical sample, drawing, BOM, finish, hardware preparation and packaging baseline.
Set inspection points, record deviations and release loading only against agreed acceptance criteria.
Do you have drawings or reference images?
We will identify which items fit the core range and which require controlled project sourcing.
Buyer FAQ
Clear answers depend on the selected construction, quantity, destination and approved supplier route.
It means LANDO selects and coordinates a suitable manufacturing route against a written project or channel brief. The nominated factory, construction, sample, quality plan and evidence are confirmed before contract.
Potentially. Interior, utility and entrance doors may require different specialist suppliers, minimum quantities and evidence. LANDO can coordinate the commercial file, but each product route remains separately defined.
The order should identify controlled drawings, finish samples, hardware preparation, packing marks and any performance evidence. Production begins only after the agreed approval route is completed.
The buyer or project consultant defines the applicable code and authority requirement. LANDO checks supplier documents against that brief and identifies gaps, but market acceptance must be confirmed before ordering.