Large architectural entrance door in a refined villa interior

Brief-led sourcing

Project-Sourced
Door Programs.

When the requirement extends beyond the core range, LANDO identifies a suitable manufacturing route and controls it through drawings, BOM, sample approval, inspection and commercial documentation.

Controlled extension

More choice without pretending every product is in-house.

LANDO’s project-sourced range may cover HPL/CPL-faced doors, moulded-skin doors, steel entrance doors, hotel entry doors and other schedule-led products. The actual producer, technical capability and evidence route are approved before contract.

This route is best used when the buyer has enough quantity and a clear specification to justify supplier qualification and sample work.

HPL-faced project door installed in a clinic corridor
Application reference. Final supplier, specification and performance are confirmed by project.

Visual shortlist

Useful directions for an early brief.

These models help identify product type and design intent. Each project then moves to supplier matching, samples and documented approval.

Available routes

Source by application and risk.

The broader the product range, the more important supplier qualification and approval discipline become.

HPL and CPL door surface samples
HPL / CPL

Durable project surfaces

For clinic, school, office, hotel and higher-use interiors, subject to selected laminate and complete doorset specification.

White moulded-skin interior doors in a residential project
MOULDED SKIN

Value-led housing programs

For repeatable residential and renovation channels where skin, core, coating and frame need a controlled baseline.

Dark steel security entrance door design reference
ENTRANCE / SECURITY

Market-specific entrance products

For distribution or projects where lock system, reinforcement, opening and finish must match local expectations.

Approval path

How an extended product becomes order-ready.

LANDO only treats a sourced product as quotation-ready after the relevant commercial and technical gaps are visible.

01Brief normalization

Translate images, door schedule, destination needs, quantity and price target into a comparable request.

02Supplier qualification

Check process fit, capacity, sample route, repeatability, export packing and available evidence.

03Sample & document approval

Approve physical sample, drawing, BOM, finish, hardware preparation and packaging baseline.

04Order control

Set inspection points, record deviations and release loading only against agreed acceptance criteria.

Do you have drawings or reference images?

Send the brief before choosing a supplier route.

We will identify which items fit the core range and which require controlled project sourcing.

Application
Construction
Finish direction
ApprovalSupplier · sample · BOM · inspection

Design reference only. Final supplier and specification follow written approval.